Not known Details About Cast in Situ Piles in Bangladesh
As seen within the figure below, constant auger is used to drill the borehole, raise up drilled soil, and pour concrete when the auger is moved up. Therefore, the borehole does not will need casing or hydrostatic pressure to forestall harm to the borehole wall.Link a hopper to the highest of tremie pipe. Following that, close the joint between hopp